December 2023

December 2023

December 23, 2023 – For the College Dormitory, heat is being brought into the building through propane tanks.  For the Student Life Center, the fire suppression system is being installed, windows are continuing to be added, and the roof is continuing to be worked on.

December 16, 2023 – For the Student Life Center, window installation has begun, the majority of the building has been wrapped, and the building has its basic roof structure with the exception of the refectory.  For the College Dormitory, flashing is being placed on the roof, electricity and plumbing are being installed, and insulation has been added to the outside walls.

December 2, 2023 – For the Student Life Center, plywood roofing is being placed on the upper section and the ceiling substructure is being placed near the chapel entrance.  For the College Dormitory, the scaffolding is up.