January 14, 2023 – Trees along the lower property water retention basin were cleared and the site entrance staging area was completed.
![P1010700](https://www.scs.edu/wp-content/uploads/2023/02/P1010700-768x576.jpg)
![P1010738](https://www.scs.edu/wp-content/uploads/2023/02/P1010738-768x576.jpg)
![P1010709](https://www.scs.edu/wp-content/uploads/2023/02/P1010709-768x576.jpg)
![P1010741](https://www.scs.edu/wp-content/uploads/2023/02/P1010741-768x576.jpg)
![P1010742](https://www.scs.edu/wp-content/uploads/2023/02/P1010742-768x576.jpg)
Previous
Next
January 29, 2023 – The area along the water retention basin has been widened and preparation for drainage and water control pipes have begun.